Program document library

Title Document(s) Publication Date
1D Hydraulic Sediment Transport Model Final Report HDR Eng 2011_1D Sediment Model (Final).pdf18.43 MB
2010 January TAC MCM Workshop Minutes 2010 January TAC MCM Workshop Minutes.pdf54.15 KB
2010 January TAC Minutes Sediment Augmentation Workshop 2010 January TAC Minutes Sediment Augmentation Workshop.pdf72.74 KB
2011 ISAC Report on PRRIP ISAC 2011_2011 Report on PRRIP.pdf518.11 KB
2016 Channel Geomorphology and In-Channel Vegetation Report FINAL Platte_River_Geomorph_Veg_2016.pdf14.35 MB
2019 AMP Reporting Session Presentations AMP Reporting Session Presentations.pdf55.32 MB
2019 Final State of the Platte Report 2019 Final State of the Platte Report4.76 MB
Adaptive Management Plan (AMP) 2012 “State of the Platte” Report – Executive Summary PRRIP 2012_AMP State of the Platte Report.pdf2.56 MB
Annual LiDAR and Aerial Photography Technical Specifications PRRIP 2011_LiDAR and Aerial Photography Specifications.pdf510.83 KB
David Marmorek, 2021 ISAC Co-Chair David Marmorek.jpg1.5 MB
Elm Creek Complex FSM Proof of Concept Report Elm Creek FSM Final Report.pdf18.72 MB
Farnsworth et al 2018 - Reproductive ecology of interior least tern and piping plover in response to Platte River hydrology and sandbar dynamics Response to the letter to the editor Farnsworth et al 2018 - Reproductive ecology of interior least tern and piping plover in response to Platte River hydrology and sandbar dynamics Response to the letter to the editor.pdf433.97 KB
FINAL 2016 PRRIP Tern and Plover SDM Report FINAL 2016 PRRIP Tern and Plover SDM Report.pdf3.52 MB
FINAL 2016 PRRIP Tern and Plover SDM Report FINAL 2016 PRRIP Tern and Plover SDM Report.pdf3.52 MB
FINAL May 28 2020 PRRIP TAC Virtual Meeting Minutes FINAL May 28 2020 PRRIP TAC Virtual Meeting Minutes.pdf201.09 KB
FINAL PRRIP 2014 State of the Platte Report FINAL PRRIP 2014 State of the Platte Report.pdf4.07 MB
FINAL PRRIP 2016 State of the Platte FINAL PRRIP 2016 State of the Platte.pdf4.99 MB
Independent Science Advisory Committee 2009 Report on the Platte River Recovery Implementation Program ISAC 2009_2009 ISAC Report on PRRIP.pdf1.76 MB
Lower Platte River Stage Change Study Final Protocol Implementation Report (FINAL) PRRIP 2012_Stage Change Study_Final.pdf31.84 MB
March 9 2017 FINAL PRRIP 2015 State of the Platte March 9 2017 FINAL PRRIP 2015 State of the Platte.pdf4.78 MB