1D Hydraulic Sediment Transport Model Final Report
|
HDR Eng 2011_1D Sediment Model (Final).pdf18.43 MB
|
|
2010 January TAC MCM Workshop Minutes
|
2010 January TAC MCM Workshop Minutes.pdf54.15 KB
|
|
2010 January TAC Minutes Sediment Augmentation Workshop
|
2010 January TAC Minutes Sediment Augmentation Workshop.pdf72.74 KB
|
|
2011 ISAC Report on PRRIP
|
ISAC 2011_2011 Report on PRRIP.pdf518.11 KB
|
|
2016 Channel Geomorphology and In-Channel Vegetation Report
|
FINAL Platte_River_Geomorph_Veg_2016.pdf14.35 MB
|
|
2019 AMP Reporting Session Presentations
|
AMP Reporting Session Presentations.pdf55.32 MB
|
|
2019 Final State of the Platte Report
|
2019 Final State of the Platte Report4.76 MB
|
|
Adaptive Management Plan (AMP) 2012 “State of the Platte” Report – Executive Summary
|
PRRIP 2012_AMP State of the Platte Report.pdf2.56 MB
|
|
Annual LiDAR and Aerial Photography Technical Specifications
|
PRRIP 2011_LiDAR and Aerial Photography Specifications.pdf510.83 KB
|
|
David Marmorek, 2021 ISAC Co-Chair
|
David Marmorek.jpg1.5 MB
|
|
Elm Creek Complex FSM Proof of Concept Report
|
Elm Creek FSM Final Report.pdf18.72 MB
|
|
Farnsworth et al 2018 - Reproductive ecology of interior least tern and piping plover in response to Platte River hydrology and sandbar dynamics Response to the letter to the editor
|
Farnsworth et al 2018 - Reproductive ecology of interior least tern and piping plover in response to Platte River hydrology and sandbar dynamics Response to the letter to the editor.pdf433.97 KB
|
|
FINAL 2016 PRRIP Tern and Plover SDM Report
|
FINAL 2016 PRRIP Tern and Plover SDM Report.pdf3.52 MB
|
|
FINAL 2016 PRRIP Tern and Plover SDM Report
|
FINAL 2016 PRRIP Tern and Plover SDM Report.pdf3.52 MB
|
|
FINAL May 28 2020 PRRIP TAC Virtual Meeting Minutes
|
FINAL May 28 2020 PRRIP TAC Virtual Meeting Minutes.pdf201.09 KB
|
|
FINAL PRRIP 2014 State of the Platte Report
|
FINAL PRRIP 2014 State of the Platte Report.pdf4.07 MB
|
|
FINAL PRRIP 2016 State of the Platte
|
FINAL PRRIP 2016 State of the Platte.pdf4.99 MB
|
|
Independent Science Advisory Committee 2009 Report on the Platte River Recovery Implementation Program
|
ISAC 2009_2009 ISAC Report on PRRIP.pdf1.76 MB
|
|
Lower Platte River Stage Change Study Final Protocol Implementation Report (FINAL)
|
PRRIP 2012_Stage Change Study_Final.pdf31.84 MB
|
|
March 9 2017 FINAL PRRIP 2015 State of the Platte
|
March 9 2017 FINAL PRRIP 2015 State of the Platte.pdf4.78 MB
|
|